240213-Z-UP142-1659
Airmen assigned to the 139th Airlift Wing, Missouri Air National Guard, refuel a C-130H Hercules aircraft Feb. 13, 2024, at Rosecrans Air National Guard Base, St. Joseph, Missouri. Aircrews conducted a 41-hour sortie in which the aircraft engines ran continuously for 45 hours and the aircraft was refueled three times.
PHOTO BY:
Michael Crane
VIRIN:
240213-Z-UP142-659.JPG
FULL SIZE:
2.56 MB
CAMERA
NIKON Z 6
LENS
24.0-70.0 mm f/2.8
APERTURE
28/10
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.